Reporting, informing and consulting look alike but differ in whom they go to and what they are for. Work begins with receiving an instruction accurately and giving it back accurately.
Horenso (報連相) is a word made by joining the heads of hokoku (report), renraku (inform) and sodan (consult). Reporting means giving the result or the progress back to the person who gave the instruction; informing means letting the people concerned know a fact; consulting means asking for opinions or advice when you cannot decide. The key point is that the addressee differs: a report goes up, informing goes sideways and around you, and consulting goes to your superior or a senior colleague. The commonest failure of "I thought I had said it" is the gap where you reported to your superior but did not inform the departments concerned.
State a report from the conclusion. The order is: "About Company A, they have asked us to push the delivery date back by 1 week. The reason is a delay in their materials. The effect on us is..." If you start from what happened, the listener has to hold the information while waiting for the conclusion, and the decision is delayed. And the iron rule is that the worse the news, the faster you tell it. The more time passes, the fewer the moves available, so even when it is not resolved, put the facts out with the preface "this is not resolved yet." What troubles a superior most is hearing about a problem for the first time on the day of the deadline.
When you receive an instruction, if you are called over, go with a notepad and something to write with. As a basic rule, listen to the end without breaking in, but once you have heard it out, check for gaps against 5W2H, that is, when, where, who, what, why, how, and how much. In particular, always confirm the deadline and the form of the deliverable, meaning how far you are to take it. If you are told "as soon as possible," propose a concrete time from your side and agree it: "would by the end of today be all right?" The whole set of actions ends with repeating the main points back, and, once you are back at your desk, tidying up your notes and settling when you will start.
In work from home, things that would have carried naturally when desks were close no longer carry. Share briefly when you start a task, when you reach a break point, and when you finish. Chat has the advantage of letting the other person choose when to read, but it does not suit urgent business, so switch to a call or a meeting. For consulting that asks for a decision, do not go back and forth at length in text; make it a short call. Once you can make these three switches, work keeps moving even at a distance. On the other hand a call leaves no record, so always put what was decided into text and share it. Even where there is a recording, searching it takes time, so putting the main points into text cannot be skipped.
Using report, inform and consult
Category
To whom
Purpose
Example
Report
The person who gave the instruction (your superior)
Give back the result or progress so they can judge
The work is finished; we will not make the due date
Inform
The people concerned (colleagues, other departments, clients)
Let them know a fact so everyone moves together
The meeting time has changed; I will be off tomorrow
Consult
Your superior or a senior colleague
Ask for a decision or advice
I am torn between two options, which would be better?
Giving the result or progress back to the person who gave the instruction. State the conclusion first and keep facts and your own opinion separate.
inform, renraku (連絡)
Letting the people concerned know a fact. It does not ask for a decision; the key point is reaching everyone affected.
consult, sodan (相談)
Asking a superior or senior colleague for opinions or advice when you cannot decide. Bringing the situation and the options with you gets it settled in a short time.
5W2H
The seven check items: when, where, who, what, why, how, and how much. Used to inspect for gaps when you receive an instruction.
interim report
Reporting progress partway through, before the work is finished. On long work, setting milestones and putting one in at each lets a drift in direction be corrected early.
repeating back, fukusho (復唱)
Saying the main points of the instruction you received out loud again, to check that your understanding matches.
Worked examples
Your superior says "please do it as soon as possible." What do you do?
Answer and reasoning The sense of "soon" differs from person to person. Confirm by proposing a concrete time, "would by the end of today be all right?" or "I will have it to you by tomorrow morning," and start only once you have agreed.
Trouble has come up partway through the work. It is not resolved yet. Should you report it?
Answer and reasoning You report it. The principle is that the worse the news, the faster you tell it; reporting only after resolving it leaves fewer moves available. Add the facts, the current situation, and possible courses of action.
Working from home, you want to consult your superior. Should you send a long chat message?
Answer and reasoning For consulting that asks for a decision, switching to a short call is faster and more accurate. After the call, leave what was decided in text in the chat.
Sources and basis: ※ There is no public regulation on this. It is an organized summary of widely accepted business practice
2. Priorities and managing your schedule
We cover how to line up several jobs held at once, how to report progress, and the legal basics on working hours and leave.
When jobs pile up, line them up along two axes: urgency and importance. What is both urgent and important comes first, but what decides your results is what is important yet not urgent, that is, planning, improvement, learning and building relationships. Unless you secure time for these first, they are always pushed back. What is urgent but not important, such as an inquiry you can answer at once, tends to get picked up first, and if you are buried in it, the important work always ends up right against the deadline. For what is neither urgent nor important, consult your superior, including on whether it may be dropped. When you are unsure, measuring not only by the deadline but by "who suffers, and how much, if this is late" makes it easier to decide.
PDCA is the idea of turning the four stages of Plan, Do, Check and Act. What matters is always to include the Check; leave it out and you repeat the same mistakes. In order to evaluate, you have to decide at the planning stage, in figures or in states, "what has to be true for this to be a success." Move to execution with a vague target and there is no way to evaluate afterwards.
Build a schedule by working back from the deadline. If you line up working time with no gaps, interruptions and rework will certainly make you late, so leave about two tenths of the whole as slack. Do not forget to include time waiting for other people's checks and approvals in the process. On long work, set your own interim deadlines and make interim reports at them. The moment you see you may be late, say the conclusion first and then tell them how far you have got, what the cause is, what you need, and by when you can deliver. Reports that are too fine-grained take up the other person's time, so it is best to set milestones and report at those.
Working hours have a legal ceiling. The Labor Standards Act provides that an employer must not have a worker work more than 40 hours per week, or more than 8 hours per day, excluding rest periods (Labor Standards Act Article 32). To have someone work beyond this, a written agreement must be concluded with a labor union organized by a majority of the workers, or with a person representing a majority of the workers, and filed with the administrative agency (Labor Standards Act Article 36). This agreement is what is commonly called a Article 36 agreement, saburoku kyotei (36協定). Do not start overtime on your own judgment; apply for it by the procedure the company lays down. As for rest periods, it is also provided that where working hours exceed 6 hours, at least 45 minutes, and where they exceed 8 hours, at least 1 hour, must be given during working hours (Labor Standards Act Article 34, paragraph 1).
As for annual paid leave, an employer must give 10 working days, consecutive or divided, to a worker who has been continuously employed for 6 months from the day of hiring and has reported for work on at least 8 tenths of all working days (Labor Standards Act Article 39, paragraph 1). After that the number of days is added to according to the years of continuous service. There is no obligation to explain a reason for taking it. However, where giving it in the period requested would hinder the normal operation of the business, the company may give it in another period (same Article, paragraph 5). In practice, the courteous thing is to apply early once your days off are decided, and to tell those concerned the state of the matters in progress, where to reach you while you are away, and the policy for handling things.
Lining up work by urgency and importance
Category
Example
How to handle it
Urgent and important
A quotation due today, responding to a complaint
Top priority; start on it right now
Not urgent but important
Planning, improvement, learning, building relationships
Secure time for it first and work through it to a plan
Urgent but not important
Short inquiries, meetings held only for form
Clear it quickly, or consider whether it can be delegated
Neither urgent nor important
Preparing material with no clear purpose
Consult your superior on whether it may be dropped
The degree of by when something must be done. Measured by how near the deadline is.
importance
The degree to which the work affects results. Measuring by who suffers, and how much, if it is late makes it easier to judge.
PDCA
A way of working that repeats the four stages of Plan, Do, Check and Act. Skip the Check and you repeat the same mistakes.
working backwards
Building a plan by tracing the process back from the deadline. Allow slack for interruptions and for waiting on other people's checks.
Article 36 agreement, saburoku kyotei (36協定)
The common name for the labor-management agreement needed in order to have people work beyond statutory working hours. A written agreement must be concluded and filed with the administrative agency (Labor Standards Act Article 36).
annual paid leave
Leave of 10 working days given to a worker who has been continuously employed for 6 months and has reported for work on at least 8 tenths of all working days (Labor Standards Act Article 39, paragraph 1). No explanation of a reason is needed to take it.
right to change the period
The mechanism by which the company may give paid leave in another period where giving it in the period requested would hinder the normal operation of the business (Labor Standards Act Article 39, paragraph 5).
Worked examples
Three jobs have piled up. Which do you start with?
Answer and reasoning Line them up by urgency and importance. What has a near deadline and a large effect comes first, but when you are unsure, show all three to your superior and confirm the priorities. Holding them all alone and making everything late is the worst outcome.
The work is not finished when the workday ends. May you just stay on?
Answer and reasoning Apply by the company's procedure. The ceiling on working hours is fixed by law (Labor Standards Act Article 32), and work beyond statutory working hours presupposes a labor-management agreement and a filing with the administrative agency (Labor Standards Act Article 36).
The paid-leave application form has a box for the reason. Must you fill it in?
Answer and reasoning There is no obligation to explain a reason for taking annual paid leave. Even so, to keep the work moving, apply early and pass on your handover and where to reach you while you are away.
Sources and basis: Labor Standards Act (労働基準法) Articles 32, 34, 36 and 39 / ※ the rest is commercial practice with no public regulation
3. First moves after a mistake, plus requests, meetings and handovers
The worse things go, the more you need a pattern. We gather the first moves after a mistake, asking things of people and turning them down, meeting etiquette, and handovers.
The first move on noticing a mistake comes down to not hiding it and telling your superior at once. The order is: first stop the damage spreading, then state the facts, show the range of the effect, put forward an emergency course of action and ask for instructions, and last, summarize the cause and how to prevent a recurrence. Analyzing the cause can wait until things have settled; what is needed first is to stop the damage. Spending time trying to recover it by yourself lets the effect spread meanwhile. Do not open with excuses; put the facts out first with "I am sorry, this is what has happened," and explain conjecture and fact separately. Where there is a risk of information leaking, as with a misdirected email, confirm the company's response before contacting the other party on your own judgment.
When you ask someone to do work, convey four things: the background, the deliverable, the deadline and the volume. With only "please handle this," the person receiving it does not know what to produce and it has to be done again. A request is an act that adds to the other person's work, so check their situation, and if it is urgent, add the reason briefly. Speaking at length about how busy you are does not settle what the other person is to do. Conversely, when you turn a request down, do not start with a flat "I cannot"; put in a cushioning phrase such as "osore irimasu ga," and show the reason you cannot take it plus what you can do instead, for example a different deadline, only part of it, or another person. Taking it on lightly and then dropping the deadline causes far more trouble than declining at the start.
The quality of a meeting is decided by distributing the purpose and the agenda before it opens. Write into the agenda the items, the time allotted to each, and what you want decided at that meeting, and send the materials in advance. During the meeting record not only the remarks but the reasoning that led to each decision, and at the end read out the decisions and the action items to confirm them. What minutes must always contain is the date, time and place, the attendees, the items, the decisions, the action items, and the next meeting. An action item only works once all three of who, by when, and what to do are there. For an item where no conclusion was reached, unless you leave a record that it is unresolved and who will settle it by when, the next meeting repeats the same discussion. Minutes are worth more the sooner they come, so aim to share them the same day.
A handover is the work of creating a state where the successor can keep the work moving without asking you. Gather into a handover document the list of duties, the matters in progress and their status, the people concerned and their contact details, past background and points to watch, and where the documents and data are kept. A purely verbal handover always leaves gaps. "Promises that are not in any document" and "the background of something that nearly became trouble" are the parts that trouble a successor most, so always write those down and leave them behind.
Items that must always be written in the minutes
Item
What to write
Points to watch
Date, time and place
When it was held, and whether in a meeting room or online
Keep the notation consistent so it can be found later
Attendees
Who attended and who was absent
Write on the assumption that absentees will see it too
Items
The topics discussed
List them in the order of the agenda
Decisions
What was decided, and what was not
Always record the unresolved matters as well
Action items
Who, by when, is to do what
Anything missing one of the three is not an action item
The first action taken immediately after a problem occurs. Its pillars are stopping the damage spreading and telling your superior early.
preventing recurrence
Fixing the mechanism or the procedure so the same problem does not happen twice. Analysis of the cause comes after the emergency response is done.
cushioning phrase
A turn of phrase placed before a request or a refusal to soften the impression, such as "osore irimasu ga" or "ainiku desu ga."
agenda
Material distributed in advance giving the items of the meeting, the time allotted to each, and what is to be decided. Its purpose is to let participants come prepared.
minutes
The record of a meeting. Write the date, time and place, the attendees, the items, the decisions, the action items and the next meeting. Unresolved matters are recorded too.
handover document
A document gathering, at a change of personnel, the list of duties, the matters in progress, the people concerned, points to watch, and where the materials are kept.
Worked examples
You sent an email meant for a client to a different company by mistake. What do you do first?
Answer and reasoning Report it to your superior at once. A misdirected email risks leaking information, and the company needs to decide the response. Before contacting the wrong recipient on your own judgment, give the facts, what you sent, and the address, accurately.
A senior colleague makes an urgent request, but you have your own deadline today and cannot take it.
Answer and reasoning Put it with a reason and an alternative: "Osore irimasu ga, I have another deadline today and no capacity. If tomorrow morning would do, I will take it on." Saying nothing, taking it all on and making both late is the worst outcome.
Is it all right to leave out of the minutes the things that were not decided?
Answer and reasoning You write them in. Unless you leave a record of what is unresolved, the next meeting repeats the same discussion. Writing in who will settle it by when makes it certain.
Sources and basis: ※ There is no public regulation on this. It is an organized summary of widely accepted business practice
Check quiz
Q1 | Hō-ren-sō
Which is an appropriate account of hō-ren-sō (報連相) — report, inform, consult?
Sōdan (相談), consulting, is returning the result to the person who gave the instruction
Hōkoku is telling the facts to everyone concerned
Hōkoku (報告), reporting, is returning the result or progress to the person who gave the instruction
Renraku (連絡), informing, is seeking a decision and asking for advice
AnswerC. Hōkoku (報告), reporting, is returning the result or progress to the person who gave the instruction
Hōkoku (報告) returns the result or progress to the person who gave the instruction; renraku (連絡) tells the facts to the people concerned; sōdan (相談) seeks a decision or advice. The three differ in who they are addressed to and what they are for.
Q2 | Bad news
Trouble has arisen in work that is under way. Which is the appropriate way to report it?
Report it all together once it is resolved
Report the facts as soon as you know them, even though it is not resolved
If you think you can handle it yourself, deliberately do not report it
Wait until the regular meeting next week and report it then
AnswerB. Report the facts as soon as you know them, even though it is not resolved
The rule is that the worse the news, the sooner you pass it on; the longer it sits, the fewer moves remain. Even unresolved, get it out early with the facts, the current position and the options you can see.
Q3 | Conclusion first
Which is an appropriate structure for an oral report to your manager?
Start with your impressions and reflections
Tell the story in order from the beginning and give the conclusion at the end
Say nothing until you are asked
Give the conclusion first, then the reasons and the course of events
AnswerD. Give the conclusion first, then the reasons and the course of events
Putting the conclusion first lets the listener organise everything that follows as material for a decision. Starting with the narrative keeps them holding judgement in suspense until the conclusion arrives.
Q4 | Taking instructions
Which is NOT appropriate when receiving instructions from your manager?
Decide you can remember it, and go back to your desk without a record
Listen to the end and then ask your questions together
Read the key points back so that you and your manager share the same understanding
Take a notepad and pen with you and write down the key points as you listen
AnswerA. Decide you can remember it, and go back to your desk without a record
Relying on memory alone produces gaps and mix-ups. Taking notes, reading them back to align understanding, and tidying the notes when you get back to your desk are all part of receiving instructions.
Q5 | The 5W2H checklist
Among the things to check when given an instruction, which is NOT part of 5W2H?
Whose referral it came through
How much it will cost
By when it must be done
How it is to be done
AnswerA. Whose referral it came through
5W2H is seven items: when, where, who, what, why, how, and how much. Whose referral something came through is not among them. The deadline and the form of the deliverable are the two to check without fail.
Q6 | A vague deadline
You are told 「なるべく早めにお願い」 ("as soon as you can, please"). Which response is appropriate?
Decide that whenever seems early to you is fine and carry on
Wait without touching it until your manager chases you
No deadline was given, so put off even starting
Propose a specific date and time — by end of today, for instance — and confirm it
AnswerD. Propose a specific date and time — by end of today, for instance — and confirm it
"Soon" means different things to different people, so propose a specific date and time and agree it. Left vague, you either get told it was slow or rush it and lose quality.
Q7 | A missed notification
A meeting's start time has changed and you have already reported this to your manager. What should you do next?
Notify everyone concerned who is due to attend
Hold the meeting with only those who know about the change
Tell people verbally outside the meeting room on the day
You told your manager, so do nothing further
AnswerA. Notify everyone concerned who is due to attend
Reporting and informing have different addressees. Stopping at the report to your manager keeps the facts from reaching everyone else. Informing people of a fact means getting it to everyone it affects.
Q8 | How to consult
A matter has come up that you are unsure how to judge. What should you do?
Let the client decide
You cannot decide, so leave it as it is
Set out the situation and the options for your manager and consult them
Decide it yourself and report it if it becomes a problem
AnswerC. Set out the situation and the options for your manager and consult them
Consulting means asking for a decision or advice. Rather than dumping it on someone, bring the situation, the options, the one you favour and why — and it will be settled quickly.
Q9 | Hō-ren-sō from home
Which is NOT appropriate about report-inform-consult while working from home?
Switch from chat to a phone call for urgent matters
Rather than exchanging long messages in text, switch a consultation to a call
Since you are not in the office, share progress all at once at the end of the month
Share a short line with colleagues when you start and finish the day's work
AnswerC. Since you are not in the office, share progress all at once at the end of the month
Working from home, nobody around you can see how things are going, so the frequency of sharing should go up, not down. Saving it for month-end delays the discovery of slippage and misunderstandings.
Q10 | Recording decisions
Which is appropriate for handling what was decided in an online meeting?
There is a recording, so nothing needs writing down
It can be recalled and confirmed at the next meeting
It was decided verbally, so no record is needed
Write the decisions down and share them with the participants
AnswerD. Write the decisions down and share them with the participants
A call leaves no record and things get misheard. Writing down the decisions and the action items and sharing them surfaces differences of understanding early. A recording takes time to search, so it is no reason to skip writing up the key points.
Q11 | Setting priorities
When work is sorted by urgency and importance, which quadrant slips down the list if left alone and therefore needs time reserved in the schedule in advance?
Urgent and important
Important but not urgent
Neither urgent nor important
Urgent but not important
AnswerB. Important but not urgent
Urgent and important work gets done whether or not you plan for it. What decides results is the important-but-not-urgent quadrant — planning, improvement — and unless time is reserved for it first, it is permanently postponed.
Q12 | The PDCA cycle
Which is the correct order of the four stages of PDCA?
Do, plan, act, check
Plan, check, do, act
Check, plan, do, act
Plan, do, check, act
AnswerD. Plan, do, check, act
The order is Plan, Do, Check, Act. Skip the check and you repeat the same mistakes, so decide at the planning stage what will count as success.
Q13 | Interim reports
You have been given a task that will take 1 month. Which is an appropriate way to run it?
Keep describing each day's work verbally in fine detail
Set your own interim deadlines and report progress along the way
Judge on the day before the deadline whether you will make it
Report nothing until it is finished and submit everything at the end
AnswerB. Set your own interim deadlines and report progress along the way
Long tasks drift off course partway through. Interim reports let corrections happen early. Reports that are too granular eat the other person's time, so set milestones and report at those.
Q14 | Reporting a delay
You realise you will miss a deadline. Which is NOT an appropriate way to tell your manager?
Tell them the moment you know
State the conclusion — that you will not make it — first
Watch how it goes until the deadline day and tell them then
Show how far you have got so far
AnswerC. Watch how it goes until the deadline day and tell them then
Told on the day, your manager can do nothing. As soon as you know, give the conclusion, the progress, the cause, the support you need and the date you can deliver — in that order.
Q15 | Preparing for leave
You have arranged to take leave in a week's time. Which is the most appropriate preparation before you go?
Keep the leave to yourself until the last moment and tell people on the morning
Write up the state of your work and the handover points and share them with those concerned
Do nothing in particular, since you can read the emails that arrive when you are back
Arrange for urgent matters to be sent to your mobile while you are on leave
AnswerB. Write up the state of your work and the handover points and share them with those concerned
Leave is a right, but the work does not stop. The basics are to write out the matters in progress, the deadlines, the contacts and who will decide in your place, and share it. Assuming you will handle things while on leave defeats the point of leave and leaves nobody able to act if you cannot be reached. Saying nothing until the last moment is the worst option, since nobody can prepare.
Q16 | The 36 agreement
Which is the correct procedure required in order to have employees work beyond statutory working hours?
Conclude a written agreement with, for example, a representative of the majority of the workers, and file it with the administrative agency
No procedure is needed if the person themselves consents
A manager's verbal permission on the spot is enough; no written procedure is needed at all
It is enough to state in the work rules that overtime may be required and make that known
AnswerA. Conclude a written agreement with, for example, a representative of the majority of the workers, and file it with the administrative agency
This is the provision in Labor Standards Act, Article 36 (労働基準法 第36条), and the agreement is commonly called the 36 agreement (saburoku kyōtei, 36協定). Both the written agreement and the filing with the administrative agency are required; verbal permission or the individual's consent is not enough.
Q17 | Requesting leave
Which is an appropriate way to go about requesting annual paid leave?
Do not request any while colleagues in your section have yet to take theirs
Ask early, once you can see how the work will go, and discuss the dates if they fall in a busy period
You cannot request leave without explaining your reason in detail
A one-way email after work the day before is enough; no company approval is needed
AnswerB. Ask early, once you can see how the work will go, and discuss the dates if they fall in a busy period
The earlier you ask, the more room there is to adjust. In law, stating a reason is not a requirement, but discussing dates that clash with the work is practical courtesy. What colleagues have taken has nothing to do with your own entitlement. A one-way notice after the fact leaves no handover and strands the people around you.
Q18 | Right to change the timing
Which is correct under the Labor Standards Act about how a company may respond to a request for annual paid leave?
Where granting leave at the requested time would impede the normal operation of the business, the company may grant it at another time
If unused days are bought out at the end of the year, there is no need to grant annual paid leave at all
Where the company is not satisfied with the reason the worker gives, it may refuse the leave
The work rules may provide in advance that leave is uniformly not granted during busy periods
AnswerA. Where granting leave at the requested time would impede the normal operation of the business, the company may grant it at another time
Labor Standards Act, Article 39, paragraph 5 (労働基準法 第39条第5項) provides that paid leave must be granted at the time the worker requests, and allows it to be granted at another time only where doing so at the requested time would impede the normal operation of the business. Refusal based on the reason, or a blanket ban, is not permitted.
Q19 | Raising your workload
Overtime has been going on and you can no longer keep up. Which is the most appropriate action?
Leave the work you cannot get to on a colleague's desk without asking and let them deal with it
Say nothing to anyone for fear of a poor appraisal, keep working late and carry it all alone
Tell your manager what you are carrying and the deadlines, discuss priorities, and use the internal support line if needed
Say nothing when you realise you will miss the deadline, and tell your manager only on the day itself
AnswerC. Tell your manager what you are carrying and the deadlines, discuss priorities, and use the internal support line if needed
Carrying it alone is what becomes irreversible. Telling your manager in numbers what is taking how long and what is likely to slip lets them reorder priorities or bring in help. Passing work on without asking, and staying silent until the last moment, both take the options away from everyone around you.
Q20 | Planning backwards
Which is an appropriate way to schedule work with a deadline?
Start when you can start, and make no plan
Pack the working time end to end and leave no slack
Work backwards from the deadline and allow slack for interruptions and rework
Ignore other people's schedules and build it around your own convenience
AnswerC. Work backwards from the deadline and allow slack for interruptions and rework
Interruptions and rework always happen, so a plan with no slack will always slip. Include the time spent waiting for others' checks and approvals in the schedule when you work backwards.
Q21 | First moves on a mistake
Which is the appropriate first move when you notice a mistake in your work?
Stop the damage spreading and tell your manager immediately
Try to see whether you can put it right yourself, and decide after that
Report it together with the next occurrence
Tell your manager once the cause is clear
AnswerA. Stop the damage spreading and tell your manager immediately
What is needed first is stopping the damage and telling your manager quickly. Analysing the cause can wait until things are calm. While you are trying to fix it yourself, the effects spread.
Q22 | A misdirected email
You have sent an email meant for a client to a different company. What is the appropriate first action?
Phone the wrong recipient to apologise, on your own initiative
Report it to your manager and confirm the company's response
They may not notice, so wait and see for a while
Tell no one and just try to recall the message
AnswerB. Report it to your manager and confirm the company's response
A misdirected email may amount to a leak of information, and the response has to be decided at company level. Contacting the recipient first on your own judgement can make matters more complicated. Report the facts, what was sent and to whom, accurately.
Q23 | Asking a colleague
Which is the lowest priority to convey when asking a colleague to do a piece of work?
A detailed account of how busy you currently are
The form of the deliverable you want
The background and purpose of the request
The deadline by which it is needed
AnswerA. A detailed account of how busy you currently are
What the person taking it on needs is the background, the deliverable, the deadline and the volume. Going on at length about your own situation does not define their work. If it is urgent, give the reason briefly.
Q24 | Saying no
Which is an appropriate way to say you cannot take on a request because you have no capacity?
Pass it to someone else on your own, without consulting your manager
Preface it with the cushion phrase osore-irimasu ga and decline, giving the reason and an alternative
Accept for now and apologise later if you cannot make it
Give no reason at all and just say you cannot
AnswerB. Preface it with the cushion phrase osore-irimasu ga and decline, giving the reason and an alternative
Agreeing lightly and then missing the deadline causes more trouble. Use a cushion phrase — 「恐れ入りますが」 (osore-irimasu ga, "I'm sorry to trouble you, but…") — and give the reason you cannot take it on, plus an alternative such as a different deadline or doing part of it.
Q25 | The agenda
Which is NOT appropriate content for a meeting agenda?
The time allocated to each item
The seating plan for the social gathering afterwards
The scope of what the meeting aims to decide
The items to be covered and their order
AnswerB. The seating plan for the social gathering afterwards
An agenda is a document that lets participants prepare. Share the items, the timings and what is to be decided in advance, and send the materials ahead too.
Q26 | Essentials of the minutes
Which must be recorded in the minutes?
The action items: who does what, by when
A list of the equipment in the meeting room and the quantity of each
A close description of each speaker's tone of voice and expression
Where in the room each attendee was sitting
AnswerA. The action items: who does what, by when
The core of minutes is the decisions and the action items. An action item only works once it has all three of owner, deadline and content. Record what was not settled as well.
Q27 | Unresolved items
Which is appropriate for an agenda item on which the meeting reached no conclusion?
Leave it to each attendee's memory
No conclusion was reached, so withdraw the item altogether
Leave it out of the minutes and discuss it again next time
Record in the minutes that it is unresolved and who will work it through by when
AnswerD. Record in the minutes that it is unresolved and who will work it through by when
If unresolved items are not recorded, the next meeting repeats the same discussion. Write down what is not settled, and who will work it through by when.
Q28 | Handover
Which is appropriate as a handover when you change roles?
Cover only the matters in progress and leave out past history and the people involved
Set out the list of duties, matters in progress, the people involved, points to watch and where the materials are kept, in a handover document
It is enough to answer your successor's questions when they come
Telling your successor verbally is enough; nothing needs to be put in writing
AnswerB. Set out the list of duties, matters in progress, the people involved, points to watch and where the materials are kept, in a handover document
Verbal handover always leaves gaps. Undocumented commitments and episodes that nearly turned into trouble are exactly what leave a successor stuck, so write them into the handover document.
Q29 | Applying for overtime
Which is appropriate when it turns out you need to keep working past your finishing time?
Apply through the company's prescribed procedure
Take it home and continue there
Work on without leaving any record
Stay on without applying and mention it verbally afterwards
AnswerA. Apply through the company's prescribed procedure
Work beyond statutory working hours presupposes a labour-management agreement and a filing with the administrative agency (Labor Standards Act, Article 36 / 労働基準法 第36条), and the company must know how many hours are worked. Staying on without applying, leaving no record, and taking work home are all to be avoided.
Q30 | Checks when accepting work
Which is the lowest priority to check when accepting a piece of work?
The form and volume of the deliverable
Who to consult if you are unsure how to judge something
The deadline by which it is needed
How the requester came to be asked for it
AnswerD. How the requester came to be asked for it
What must be settled at the point of accepting is what, by when, in what form, and who to ask if you get stuck. The history behind the request is useful if you know it, but you can start without it. Leave the deadline and the form of the deliverable vague, on the other hand, and you will be redoing the work after you submit it.
Practice: answer the questions on this page
This practice tool asks questions in random order (it works when JavaScript is enabled). You can still read all the questions and explanations above without it.
* The explanations are information for study purposes. Exam scope and systems change from year to year, so always check the official announcements of the organization that administers the exam.
This page is a translation of the Japanese original. If the translation and the original differ, the Japanese version takes precedence. View the Japanese original