Under the Electricity Business Act (電気事業法), who has the duty to keep business-use electrical facilities in line with the technical standards?
The electrician who did the work
The power line operator for the area
The person who installs the facility
The electrical contractor that took the job
AnswerC. The person who installs the facility
Article 39(1) of the Electricity Business Act puts the duty to maintain the facility in line with the technical standards on the person who installs it. An electrician's duty is to do the work so that it meets the technical standards (Electricians Act (電気工事士法), Article 5); it is not a duty to maintain the facility. The power line operator investigates general electrical facilities (Article 57). An electrical contractor takes on the work but is not the party that maintains the finished facility.
Q2 | Order to meet technical standards
When a private-use electrical facility is found not to meet the technical standards, what may the competent minister do under the Electricity Business Act?
Order the installer to repair, modify or move it, or stop using it for a time
Cancel the licence of the electrician who did the work on the spot
Order the electrical contractor to repair it free of charge
Order the power line operator to remove the facility
AnswerA. Order the installer to repair, modify or move it, or stop using it for a time
Under Article 40 of the Electricity Business Act, when the competent minister finds that a business-use facility does not meet the technical standards, the minister may order the installer to repair, modify or move it or to stop using it for a time, or may restrict its use. Ordering an electrician to return a licence is done by the prefectural governor under the Electricians Act, not under this article. Article 40 does not provide for ordering a contractor to repair for free or ordering the power line operator to remove the facility.
Q3 | Filing safety rules
Which statement about the safety rules (保安規程) for private-use electrical facilities (other than small business-use facilities) is correct under the Electricity Business Act?
They are made within one year after use starts and filed with the prefectural governor
The chief electrical engineer makes them personally and no filing is needed
The contractor who did the work makes them and gives them to the installer
They are made for each organisation and filed with the competent minister before use starts
AnswerD. They are made for each organisation and filed with the competent minister before use starts
Under Article 42(1) of the Electricity Business Act, the installer of a business-use facility (other than a small business-use facility) makes safety rules for each organisation that must secure safety as a unit, and files them with the competent minister before use starts. There is no one-year grace period after use starts, and they are not filed with the governor. The installer makes the rules, not the chief engineer or the contractor.
Q4 | Changing safety rules
The installer of a private-use electrical facility has changed its safety rules. What does the Electricity Business Act require?
Get the competent minister's approval at least 30 days before the change
Notify the competent minister of the changes without delay
No filing is needed if the chief electrical engineer agrees
Report it to the inspector at the next periodic inspection
AnswerB. Notify the competent minister of the changes without delay
Under Article 42(2) of the Electricity Business Act, when the safety rules are changed, the installer must notify the competent minister of the changes without delay. It is not a system of approval before the change. Nothing says the chief engineer's agreement removes the need to file. Waiting until the next periodic inspection would not be "without delay".
Q5 | Notice of appointing a chief engineer
The installer of a private-use electrical facility has appointed a holder of a chief electrical engineer licence as chief engineer. What does the Electricity Business Act require?
Get the competent minister's permission before the appointment
Notify the competent minister of the appointment without delay
Notify the prefectural governor within one year of the appointment
No notice is needed; just post the name at the site
AnswerB. Notify the competent minister of the appointment without delay
Under Article 43(3) of the Electricity Business Act, when a licence holder is appointed chief engineer, the installer notifies the competent minister without delay (the same applies when the chief engineer is dismissed). Permission from the minister is needed only when a person without a licence is appointed (Article 43(2)). The notice does not go to the governor, and there is no one-year deadline. Posting a name does not replace the notice.
Q6 | Appointing a person without a licence
When may the installer of a private-use electrical facility (other than a small business-use facility) appoint a person without a chief engineer licence as chief engineer?
Without permission, when the person holds a first-class electrician licence
Without permission, when the person has 5 or more years of electrical work experience
When the installer notifies the competent minister after the appointment
When the installer has the competent minister's permission
AnswerD. When the installer has the competent minister's permission
Under Article 43(2) of the Electricity Business Act, the installer of a private-use facility (other than a small business-use facility) may appoint a person without a chief engineer licence only with the competent minister's permission. A first-class electrician licence is not a chief engineer licence, so it does not allow appointment without permission. Years of experience alone do not remove the need for permission. Notice after appointment is the procedure for appointing a licence holder (Article 43(3)); appointing a person without a licence needs permission in advance.
Q7 | Instructions of the chief engineer
During work on high-voltage receiving equipment, the site's chief electrical engineer gives an instruction for safety. Which statement about a first-class electrician doing the work is correct under the Electricity Business Act?
They must follow the instructions the chief engineer gives for safety
As licensed electricians, they may decide for themselves whether to follow them
Only the installer's own employees must follow them, not outside workers
They need not follow an instruction that is stricter than the technical standards
AnswerA. They must follow the instructions the chief engineer gives for safety
Under Article 43(5) of the Electricity Business Act, people engaged in the construction, maintenance or operation of business-use facilities must follow the instructions the chief engineer gives for safety. Holding an electrician licence does not change this. The article says "people engaged" and is not limited to the installer's employees, so outside workers are included. There is no rule allowing workers to ignore an instruction because it is stricter than the technical standards.
Q8 | Scope of a third-class chief electrical engineer
Which business-use electrical facility may a third-class chief electrical engineer (第三種電気主任技術者) supervise?
The demand facilities of a 3,000 kW factory that receives power at 66,000 V
A 6,000 kW solar power plant operating at 22,000 V
The demand facilities of a 400 kW factory that receives power at 6,600 V
A substation inside a factory operating at 77,000 V
AnswerC. The demand facilities of a 400 kW factory that receives power at 6,600 V
Under Article 56 of the Enforcement Regulations of the Electricity Business Act, a third-class chief electrical engineer may supervise business-use facilities below 50,000 V, except power plants and storage facilities of 5,000 kW or more. Demand facilities receiving at 6,600 V qualify. The 66,000 V demand facilities and the 77,000 V substation are 50,000 V or more, so they need a second-class (below 170,000 V) or higher licence. The 22,000 V solar plant is below 50,000 V, but its output is 5,000 kW or more, so it is excluded from the third-class scope.
Q9 | Outsourcing safety management
Which demand facility may have no chief electrical engineer appointed if the outsourcing of safety management work is approved (Article 52(2) of the Enforcement Regulations of the Electricity Business Act)?
Demand facilities that receive power at 22,000 V
Demand facilities under 500 kW maximum demand, whatever the receiving voltage
Demand facilities under 2,000 kW that receive power at 77,000 V
Demand facilities that receive power at 7,000 V or below
AnswerD. Demand facilities that receive power at 7,000 V or below
Article 52(2) of the Enforcement Regulations lists demand facilities receiving power at 7,000 V or below among the facilities that need no chief electrical engineer when a contract to outsource safety management work is made and approved. Demand facilities receiving at 22,000 V or 77,000 V do not meet this condition. The condition depends on the receiving voltage; there is no rule that any facility under 500 kW may outsource regardless of voltage.
Q10 | Holding two chief engineer posts
Which statement is correct about having one chief electrical engineer serve as chief engineer for two sites?
It is allowed with only a notice if both sites belong to the same company
It is prohibited in principle, but allowed with approval
It is allowed without limit for a first-class chief electrical engineer
It is never allowed under any circumstances
AnswerB. It is prohibited in principle, but allowed with approval
Under Article 52(4) of the Enforcement Regulations of the Electricity Business Act, the installer must not, in principle, have one chief engineer serve for two or more sites or facilities. It is allowed when approval is given because safety will not be compromised. Being in the same company or filing a notice is not enough, and the licence class does not remove the limit. Because approval allows an exception, "never allowed" is also wrong.
Q11 | Reporting an electric shock accident
A worker received an electric shock at a private-use electrical facility and was admitted to hospital. Which describes the report required by the Regulations on Electricity-Related Reports (電気関係報告規則)?
A quick report as soon as possible within 24 hours, then a written report within 30 days
Only a written report within 30 days, and only if the hospital stay exceeds one week
A report to the prefectural governor within 7 days, only if someone died
A report by the chief engineer to the Minister within 3 months of the accident
AnswerA. A quick report as soon as possible within 24 hours, then a written report within 30 days
Article 3 of the Regulations makes deaths and hospital admissions caused by electric shock reportable accidents. A quick report (by phone or similar) is made as soon as possible within 24 hours of learning of the accident, and a written report is submitted within 30 days of the day of learning of it. Reports go to the head of the regional Industrial Safety and Inspection Department (産業保安監督部長) for the site. There is no condition on the length of the hospital stay, and it is not limited to deaths. A report to the governor or a 3-month deadline is not provided for.
Q12 | Supply disruption accidents
Among the accidents that must be reported under the Regulations on Electricity-Related Reports, which is what is commonly called a "supply disruption accident" (波及事故)?
An earth-leakage breaker in a factory's LV distribution board trips and some lights in the factory go out
Lightning trips the utility's distribution line, and a factory supplied by that line loses power
An earth fault in the service cable of a 6,600 V factory trips the utility line and the area loses power
A motor in a factory burns out, but no power cut occurs inside or outside the site
AnswerC. An earth fault in the service cable of a 6,600 V factory trips the utility line and the area loses power
Article 3 of the Regulations makes reportable an accident in which damage to a private-use facility of 3,000 V or more, or wrong operation or failure to operate it, causes a supply disruption for a general transmission and distribution utility or similar. An earth fault in the HV service cable that trips the utility line and cuts power to the neighbourhood is such an accident. A tripped earth-leakage breaker cuts power only inside the site at low voltage, not the utility's supply. When lightning trips the line, the factory's equipment is not the cause. A motor burning out with no power cut causes no supply disruption.
Q13 | Private-use facilities under the Electricians Act
Which is a "private-use electrical facility" under the Electricians Act (電気工事士法), so that work on it requires a first-class electrician licence (excluding special electrical work)?
A 1,500 kW solar power plant
The demand facilities of a factory with a maximum demand of 800 kW
The HV receiving equipment of a building with a maximum demand of 450 kW
A private safety communication system
AnswerC. The HV receiving equipment of a building with a maximum demand of 450 kW
Article 1-2 of the Enforcement Regulations of the Electricians Act excludes power plants, storage facilities, substations, demand facilities of 500 kW or more, transmission lines and safety communication systems from private-use facilities under the Act. The HV receiving equipment of a 450 kW building is not excluded, so it is within the first-class scope. A solar power plant is a power plant, 800 kW demand facilities are 500 kW or more, and a safety communication system is excluded, so none of these is covered by the licences under the Act.
Q14 | Scope of neon work
In work on a neon installation at a private-use facility, which task is not part of the special electrical work called "neon work", so a first-class electrician may do it?
Installing and connecting a neon transformer
Connecting the supply-side wires to the main switch for the neon
Work on a time switch installed for the neon
Work on the neon tubes and their accessories
AnswerB. Connecting the supply-side wires to the main switch for the neon
Article 2-2 of the Enforcement Regulations of the Electricians Act defines neon work as work on the distribution board, main switch (excluding the part connecting the supply-side wires), time switch, switches, neon transformer, neon tubes and their accessories installed for neon. The connection of the supply-side wires to the main switch is excluded, so it is not special work and a first-class electrician may do it. Work on the neon transformer, the time switch, and the tubes and accessories is neon work and needs a special electrical work qualification (特種電気工事資格者) for neon work.
Q15 | Scope of emergency generator work
For an emergency standby generator at a private-use facility, which work may a first-class electrician do without a special electrical work certificate?
Work on the prime mover that drives the generator
Work on the generator installed as the emergency standby unit
Work on the accessories of the generator and switchboard
Connecting the switchboard to the wires leading to other demand equipment
AnswerD. Connecting the switchboard to the wires leading to other demand equipment
Article 2-2 of the Enforcement Regulations of the Electricians Act defines emergency standby generator work as work on the prime mover, generator, switchboard (excluding the part connecting wires to other demand equipment) and their accessories installed as an emergency standby unit. The connection between the switchboard and wires to other demand equipment is excluded, so a first-class electrician may do it. Work on the prime mover, the generator and their accessories is special electrical work and needs a special qualification for emergency standby generators.
Q16 | Issuing certificates
Which statement about the special electrical work qualification certificate (特種電気工事資格者認定証) and the certified electrical worker certificate (認定電気工事従事者認定証) is correct?
The Minister of Economy, Trade and Industry issues them, with the power delegated to the head of the Industrial Safety and Inspection Department for the person's address
Like electrician licences, the law says they are issued by the governor of the prefecture where the person lives
The Electrical Engineers Examination Center issues them to people who pass the electrician exam
There is one special work certificate that covers all kinds of special electrical work
AnswerA. The Minister of Economy, Trade and Industry issues them, with the power delegated to the head of the Industrial Safety and Inspection Department for the person's address
Under Article 4-2(1) of the Electricians Act, both certificates are issued by the Minister of Economy, Trade and Industry. Under Article 14 of the Order for Enforcement, the power to issue them is exercised by the head of the Industrial Safety and Inspection Department for the applicant's address. Prefectural governors issue electrician licences, not these certificates. The Examination Center runs exams and does not issue certificates. Special work certificates are issued separately for each kind of special work (Article 4-2(2)).
Q17 | Training for first-class electricians
Which statement about the training course for first-class electricians is correct under the Electricians Act?
They must take a course on the safety of private-use facilities within 3 years of the licence being issued
Second-class electricians must also take the same course every 5 years
They must take a course on the safety of private-use facilities within 5 years of the licence being issued
Once the course has been taken, it never needs to be taken again
AnswerC. They must take a course on the safety of private-use facilities within 5 years of the licence being issued
Under Article 4-3 of the Electricians Act, a first-class electrician must, unless there is an unavoidable reason, take a course on the safety of private-use electrical facilities run by a body designated by the Minister within 5 years of the licence being issued. The period is not 3 years. The duty applies only to first-class electricians. The article says the same applies after each course, so it is not a one-time duty; the course is taken again within every 5 years.
Q18 | Notified electrical contractors
Someone plans to start an electrical contracting business doing only private-use electrical work, with one office in Kanagawa. What does the Electrical Contractors Act (電気工事業法) require?
Notify the governor of Kanagawa at least 10 days before starting the business
Register with the governor of Kanagawa before starting the business
Notify the Minister of Economy, Trade and Industry at least 10 days before starting
Notify the governor of Kanagawa within 30 days after starting the business
AnswerA. Notify the governor of Kanagawa at least 10 days before starting the business
Under Article 17-2 of the Electrical Contractors Act, a person who will do only private-use electrical work gives notice at least 10 days before the day the business is to start. When all offices are in one prefecture, the notice goes to that prefecture's governor. Registration is needed for businesses that include general electrical work (Article 3). Notice to the Minister applies when there are offices in two or more prefectures. Notice after starting would not meet the 10-days-before deadline.
Q19 | Who may do private-use electrical work
An electrical contractor assigns workers to a factory with a maximum demand of 300 kW (a private-use facility under the Electricians Act). Which statement is correct under the Electrical Contractors Act?
A second-class electrician with 3 or more years of experience after licensing may be assigned to HV receiving equipment
Any first-class electrician may be assigned to neon work
Certified electrical workers may be assigned to emergency standby generator work
Certified electrical workers may be assigned to work on equipment used at 600 V or below (excluding power lines)
AnswerD. Certified electrical workers may be assigned to work on equipment used at 600 V or below (excluding power lines)
Under Article 21(4) of the Electrical Contractors Act, a contractor may assign certified electrical workers (認定電気工事従事者) to simple electrical work, meaning work on private-use facilities used at 600 V or below, excluding power lines. In principle, only first-class electricians may be assigned to private-use work (Article 21(1)). Three years of experience for a second-class electrician is a requirement for chief electricians, not a qualification for private-use work. Neon work and emergency standby generator work are special work, for which only holders of the matching special qualification may be assigned (Article 21(3)).
Q20 | Duties of notified contractors
Which statement about a notified electrical contractor (通知電気工事業者) that does only private-use electrical work is correct under the Electrical Contractors Act?
It must appoint a first-class electrician as chief electrician at each office
It has no duty to appoint a chief electrician (主任電気工事士) at its offices
It has no duty to keep records at each office
It has no duty to keep instruments such as insulation resistance testers at its offices
AnswerB. It has no duty to appoint a chief electrician (主任電気工事士) at its offices
The duty to appoint a chief electrician (Article 19 of the Electrical Contractors Act) applies to offices of registered contractors that do general electrical work. A notified contractor doing only private-use work has no such duty. On the other hand, the duties to keep instruments (Article 24) and records (Article 26) apply to "electrical contractors", which include both registered and notified contractors (Article 2).
Q21 | Instruments that may be arranged when needed
Among the instruments an office doing private-use electrical work must keep, which one counts as kept if arrangements are in place to use it when needed?
High-voltage detector
Relay testing equipment
Insulation resistance tester
Earth resistance tester
AnswerB. Relay testing equipment
Article 11(1) of the Enforcement Regulations of the Electrical Contractors Act lists the instruments for offices doing private-use work: insulation resistance tester, earth resistance tester, a multimeter that measures resistance and AC voltage, low-voltage detector, high-voltage detector, relay testing equipment and dielectric strength testing equipment. For the relay testing equipment and the dielectric strength testing equipment only, it includes cases where "arrangements are in place to use them when needed". The high-voltage detector, insulation resistance tester and earth resistance tester do not get this treatment.
Q22 | Role of PAS and GR (1)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
What is the main role of (1) (PAS and GR) in Figure 1?
To detect an earth fault on the premises and open automatically, preventing a supply disruption on the utility line
To divert abnormal voltage from lightning to earth and protect the equipment on site
To transform voltage and current so that energy can be metered for billing
To supply leading current to lagging loads and improve the power factor
AnswerA. To detect an earth fault on the premises and open automatically, preventing a supply disruption on the utility line
(1) is a pole-mounted load-break switch with a ground relay (GR付PAS), the first section switch on the customer side. When the GR detects an earth fault on the premises, it opens automatically and keeps the fault from spreading to the utility's distribution line (a supply disruption accident). Diverting abnormal voltage to earth is the job of the surge arrester (4), transforming for metering is the VCT (5), and improving the power factor is the capacitor (11).
Q23 | Operating the DS (3)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
Which is the correct way to handle (3) (DS) in Figure 1?
Let it open automatically to interrupt short-circuit current when a short circuit occurs
Open it while load current is flowing to stop the equipment
Let it open automatically on a signal from the overcurrent relay
Open and close it with no load current flowing, to isolate the circuit for inspection
AnswerD. Open and close it with no load current flowing, to isolate the circuit for inspection
(3) is a disconnector (断路器). It is used to open and isolate a circuit for inspection and similar work, and it cannot switch current. So it is operated when no load current is flowing. It cannot interrupt short-circuit current, and opening it under load would draw an arc and be dangerous. The device opened automatically by the overcurrent relay (OCR) is the vacuum circuit breaker (VCB) (6).
Q24 | Earthing for the LA (4)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
Which class of earthing is applied to (4) (LA) in Figure 1?
Class B earthing
Class C earthing
Class A earthing
Class D earthing
AnswerC. Class A earthing
Under Article 37(3) of the Interpretation, surge arresters on high-voltage and extra-high-voltage circuits get Class A earthing. Class B is for the low-voltage neutral of a transformer linking high and low voltage (Article 24), Class C is for metal enclosures of low-voltage equipment over 300 V (Article 29), and Class D is for the secondary circuit of high-voltage instrument transformers and enclosures of low-voltage equipment of 300 V or less (Articles 28 and 29).
Q25 | When surge arresters are required
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
For (4) (LA) in Figure 1: under the Interpretation of the technical standards, at the service entrance of a customer supplied from a high-voltage overhead line, from what receiving capacity is a surge arrester required?
50 kW
500 kW
300 kW
2,000 kW
AnswerB. 500 kW
Article 37(1)(iii) of the Interpretation requires a surge arrester at (or near) the service entrance of a customer supplied from a high-voltage overhead line with a receiving capacity of 500 kW or more. 50 kW, 300 kW and 2,000 kW are not the threshold in this article. Article 49 of the Ministerial Ordinance on technical standards also requires surge arresters or other suitable measures at service entrances where lightning voltage could damage the equipment.
Q26 | Name of the VCT (5)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
What is the VCT at (5) in Figure 1?
Zero-phase current transformer
Voltage transformer
Current transformer
Combined voltage and current transformer for metering
AnswerD. Combined voltage and current transformer for metering
A VCT (計器用変圧変流器) combines a voltage transformer (VT) and a current transformer (CT) in one unit as an instrument transformer for power trading. It sends voltage and current to the watt-hour meter (Wh) to meter energy for billing. A zero-phase current transformer (ZCT) detects the zero-phase current that flows in an earth fault and is used with a ground relay. A voltage transformer converts only voltage ((7) in the figure), and a current transformer only current ((8)).
Q27 | Device tripped by the OCR
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
In Figure 1, which device opens automatically to interrupt the circuit when the OCR at (8) detects overcurrent?
The VCB at (6)
The DS at (3)
The PAS at (1)
The LBS with PF at (9)
AnswerA. The VCB at (6)
The CT (8) converts the current to a small current and sends it to the OCR (overcurrent relay). When the OCR detects overcurrent, it trips the VCB (vacuum circuit breaker) (6) to interrupt short-circuit current and the like. The dashed lines in the figure show these signals. The disconnector (3) cannot switch current. The PAS (1) opens on a signal from the GR (ground relay) and is not connected to the OCR. The LBS with PF (9) interrupts a short circuit by its current-limiting fuses blowing, not by an OCR signal.
Q28 | Earthing the instrument transformer secondary
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
Which class of earthing is applied to the secondary circuits of (7) (VT) and (8) (CT) in Figure 1?
Class A earthing
Class B earthing
Class D earthing
Class C earthing
AnswerC. Class D earthing
Under Article 28(1) of the Interpretation, the secondary circuit of a high-voltage instrument transformer gets Class D earthing (for extra-high-voltage instrument transformers it is Class A). Class A is for surge arresters and metal enclosures of high-voltage equipment, Class B for the low-voltage neutral of a transformer linking high and low voltage, and Class C for metal enclosures of low-voltage equipment over 300 V.
Q29 | Requirements for (6)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
(6) in Figure 1 is an overcurrent circuit breaker on a high-voltage circuit. What does the Interpretation of the technical standards require of it?
The ability to blow within 2 minutes at twice its rated current
The ability to interrupt the short-circuit current passing through it, and a device showing whether it is open or closed
A device that alarms a staffed station when an earth fault occurs
The ability to divert abnormal voltage from lightning to earth
AnswerB. The ability to interrupt the short-circuit current passing through it, and a device showing whether it is open or closed
Article 34(1) of the Interpretation requires an overcurrent breaker on a high-voltage or extra-high-voltage circuit to be able, if it operates on a short circuit, to interrupt the short-circuit current passing that point, and to have a device that shows its open or closed state when it operates (not needed if the state is easy to see). Blowing within 2 minutes at twice the rated current is the requirement for high-voltage non-enclosed fuses in Article 34(3). An alarm to a staffed station is a rule allowing an earth-fault breaker to be omitted (Article 36(5)). Diverting abnormal voltage to earth is the job of a surge arrester.
Q30 | Role of the SR (10)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
What is the main purpose of putting (10) (SR) in series with the capacitor (11) in Figure 1?
To add more leading current together with the capacitor and improve the power factor further
To interrupt short-circuit current and disconnect the capacitor in a short circuit
To transform the capacitor current so that energy can be metered for billing
To reduce voltage distortion from harmonics and limit inrush current into the capacitor
AnswerD. To reduce voltage distortion from harmonics and limit inrush current into the capacitor
(10) is a series reactor (直列リアクトル). The Japan Electrical Manufacturers' Association (日本電機工業会) explains that a series reactor improves system voltage distortion caused by harmonics and suppresses the capacitor's inrush current, and recommends it also to avoid capacitor damage from harmonics. Improving the power factor is the job of the power capacitor (11). Interrupting short-circuit current to disconnect the capacitor is done by the current-limiting fuses of the LBS with PF (9). Transforming for billing is the job of the VCT (5).
Q31 | Role of the SC (11)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
What is the main purpose of installing (11) (SC) in Figure 1?
To improve the power factor of lagging loads and reduce wasted power
To reduce voltage distortion caused by harmonics
To step 6,600 V down to the low voltage of 210 V
To detect an earth fault on site and open the circuit automatically
AnswerA. To improve the power factor of lagging loads and reduce wasted power
(11) is a high-voltage power-factor-correction capacitor (高圧進相コンデンサ). It supplies leading current to lagging loads such as motors, improving the power factor and, as the Japan Electrical Manufacturers' Association explains, reducing wasted power. Reducing harmonic voltage distortion is the job of the series reactor (10). Stepping 6,600 V down to 210 V is done by the transformers (12)(13). Detecting an earth fault and opening is done by the PAS with GR (1).
Q32 | Operation of the LBS with PF (9)
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
Which correctly describes how (9) (a high-voltage load-break switch with current-limiting fuses) in Figure 1 works?
The switch contacts alone interrupt both load current and short-circuit current
The switch may be operated only with no current flowing, and the fuses switch the load current
The switch makes and breaks load current, and the current-limiting fuses blow to interrupt short-circuit current
The switch opens automatically when it detects earth-fault current on site
AnswerC. The switch makes and breaks load current, and the current-limiting fuses blow to interrupt short-circuit current
A high-voltage load-break switch (LBS) is a disconnector with an arc chamber added so that it can switch load current. The fuse-equipped type can interrupt short-circuit current by blowing its current-limiting fuses. The switch contacts alone do not interrupt short-circuit current. A device that may be operated only with no current flowing is a disconnector, and fuses are not used to switch load current. Opening automatically on an earth fault is done by the PAS with GR (1).
Q33 | Earthing the transformer LV side
Figure 1. Single-line diagram of a high-voltage receiving installation (6,600 V overhead supply, cubicle type)
Which class of earthing is applied to the low-voltage neutral of the single-phase transformer (6600/210-105 V) at (13) in Figure 1?
Class A earthing
Class B earthing
Class C earthing
Class D earthing
AnswerB. Class B earthing
Under Article 24 of the Interpretation, a transformer linking a high-voltage circuit and a low-voltage circuit gets Class B earthing at the low-voltage neutral. This protects against the danger of the low-voltage side rising in voltage to earth if the high and low windings come into contact. Class A is for high-voltage equipment such as surge arresters and transformer metal enclosures, Class C for enclosures of low-voltage equipment over 300 V, and Class D for the secondary circuits of high-voltage instrument transformers.
Q34 | Housing high-voltage equipment
Which method does the Interpretation of the technical standards give for installing high-voltage equipment so that people cannot touch it?
Put it in an unearthed metal box and put a sign on the door saying it is dangerous
Put it in a wooden box and wrap insulating tape around the box and door joints
Install it outdoors 2 m above the ground with a warning sign nearby
Put it in a metal box with Class D earthing or similar, with no live parts exposed
AnswerD. Put it in a metal box with Class D earthing or similar, with no live parts exposed
Article 21(iv) of the Interpretation allows high-voltage equipment to be put in a concrete box or a metal box with Class D earthing, with no live parts exposed. A metal box needs Class D earthing, so an unearthed box does not qualify. Putting it in a wooden box is not a listed method. Installing it high up (item iii) requires a height of 4.5 m or more above the ground (4 m outside urban areas) and cables or similar for the attached high-voltage wires.
Q35 | Clearance for arcing devices
A high-voltage switch that produces an arc when it operates is installed near a combustible material such as a wooden wall. If the arcing part is not enclosed in fire-resistant material, what is the minimum clearance from the combustible material?
1 m
0.5 m
2 m
3 m
AnswerA. 1 m
Article 23 of the Interpretation says that high-voltage and extra-high-voltage switches, breakers, surge arresters and similar devices that produce an arc when operating must either have the arcing part enclosed in fire-resistant material or be kept at least the distance in Table 23-1 from combustible materials such as wooden walls and ceilings. For high voltage it is 1 m. 2 m is the value for extra-high voltage (1 m if the voltage is 35,000 V or less and the arc direction and length are limited), and 0.5 m and 3 m are not in the table.
Practice: answer the questions on this page
This practice tool asks questions in random order (it works when JavaScript is enabled). You can still read all the questions and explanations above without it.
* The explanations are for study purposes. Always check the Electrical Technician Examination Center's official announcements for how the exam is held, its scope and its pass mark. All questions are original questions written for this site, not real exam questions. Real electrical work must follow the law and requires the proper licence.
This page is a translation of the Japanese original. If the translation and the original differ, the Japanese version takes precedence. This translation was made with AI and may contain errors.Report a translation errorView the Japanese original